• 2017
  • 2016
  • 2015
  • 2014
  • 2013
  • 2012
  • 2011
  • 2010
  • 2009
  • 2008
  • 2007
  • 2006
  • 2005
  • 2003
  • 2002
  • 2001
  • 2000
  • 1999
  • 1998
  • 1997
  • 1995
  • 1993
  • 1992
  • 1991
  • 1990
  • 1989
  • 1988
  • 1987
  • 1986
  • 1985
  • 1984
  • 1982
  • 1979
  • 1977
  • 1972
  • 1971
  • 1969
  • 1968
  • 1966
  • 1965
  • 1960
  • 1956
  • Conkers Aerial Walkway
  • Eastfields Estate Regeneration
  • Spring at Stonebridge Park
  • Maitland Park
  • RHS Hyde Hall Restaurant
  • National Automotive Innovation Centre
  • RHS Garden Bridgewater
  • Artist's House, Brixton
  • Bristol Harbourside Building 3a
  • IVIC: BIMSpace
  • Queen Mary University of London
  • Holy Cross Primary School
  • Cherry Tree Children's Centre
  • Bristol Harbourside Building 4
  • VLRNIC
  • Emerald Circus
  • Bunhill 2 Energy Centre
  • Pontifex Wharf
  • Hide House
  • RHS Hyde Hall Learning Centre
  • House in Hampstead
  • Central Building Refurbishment
  • Baldwin Terrace Residential Development
  • Rosendale Primary School
  • Cryfield Energy Centre
  • IINM
  • RE-Fab House
  • Maggie's Newcastle
  • Guardbridge Energy Centre
  • City University London
  • IIPSI
  • Foundry
  • Shenley Academy
  • BFI Master Film Store
  • Palestinian Museum
  • Forest Gate Community School
  • Shahat Garden City
  • Brampton Manor Academy
  • Torriano Junior School Gatehouse
  • Institute for Sustainability
  • Evans Granary
  • Olisa Library
  • The Green Mountain Project
  • John Hope Gateway
  • Kew Herbarium, Library, Art & Archives Wing
  • Letchworth Transition Town
  • Stonebridge Hillside Hub
  • Chinese University of Hong Kong
  • Richmond Park Golf Clubhouse
  • International Digital Laboratory
  • Cambridge Conservation Campus
  • Bristol Harbourside Building 9
  • Bristol Harbourside Building 3b
  • Masshouse Block D
  • Gateway to Petra
  • Singapore Management University
  • Purcell School Music Centre
  • Barge Arm Development
  • Heart of the Forest Masterplan
  • Bristol Harbourside Building 10
  • Penarth Heights Regeneration
  • Li Ka Shing Library
  • Lewisham Young People's Centre
  • Centre for Mathematical Sciences
  • Education and Interpretation Centre
  • Downland Gridshell
  • International Manufacturing Centre
  • Millennium Primary School & Health Centre
  • Bristol Harbourside Masterplan
  • Faculty of Divinity
  • Private House
  • UEL Docklands Campus
  • Ludgate Hill
  • Chester Amphitheatre Hotel
  • Hooke Park
  • Pittville Art College Campus Masterplan
  • Archaeolink Visitor Centre
  • University of North Carolina Masterplan
  • Clach Mhor
  • St John's College Library
  • Goldney Hall Student Residences
  • Petershill House
  • Fountains Abbey Visitor Centre
  • BP International Group Learning Centre
  • Bedfont Lakes Offices
  • Charles Cryer Theatre
  • RMC International HQ
  • Farnborough Grange Junior School
  • Chilworth Park Research Centre
  • Morrison Street
  • MacIntyre Milton Keynes
  • Crookham Junior School
  • Beechwood Lodge Hostel
  • Copped Hall Offices
  • Lambeth Community Care Centre
  • Whittington Centre
  • Uplands Conference Centre
  • Westoning Manor
  • Winchester College Arts Centre
  • St Mary's Church
  • Royal Opera House
  • Calthorpe Park School
  • Charlie Chaplin Adventure Playground
  • Bradwell Common 2
  • Westmoreland Road
  • Leighton Crescent
  • Highgrove Housing
  • Olivetti's New Branches
  • Branksome Hilders, Olivetti
  • Minster Lovell Conference Centre
  • House on the South Downs
  • Garrett House
  • Camden Mews
  • Bartholomew Villas
  • Marvin House
  • Horder House
  • Bell Tout Lighthouse
View: Grid List
Date
2010
Region
UK
Sector
Retrofit Schools
Budget
£5m - £20m
Client
Newham BSF/Laing O'Rourke
Location
London Borough of Newham
Size
14,877sqm
Team
Laing O'Rourke, AKT, Hoare Lea, Arup, Aecom, Gleeds, Plincke, Jerram Falkus Construction Ltd
Press
Architecture Today (2010)

Extensive remodelling of a 10-form entry secondary school to allow for new specialist facilities which can be separately accessed and zoned for community and extended school use.

Brampton Manor Academy

The internal reorganisation of the school provides a professional theatre space, new TV/audio studios and media editing suites, a new fitness suite, and improved design, technology, art and ICT classrooms.

A new inclusion area of EAL and SEN suites has flexible learning spaces, specialist facilities and a permanent and visiting staff base.

The existing circulation has been significantly improved with a new lift, replacement of stairs in the existing corridors with ramps and two new glazed, double-storey circulation links in the re-landscaped east and west courts.

The links reduce travel distances around the school. They also provide places for the display of the arts on the walls and along the animated brick base, with integral seating extending to the courtyard landscaping.

The creation of a high quality landscaped forecourt, free of vehicles and framed by the new performing arts and media wings, helps to create a sense of arrival to the Academy.

Through careful planning with the school, the development was built in phases to minimise disruption and omit the need for any temporary accommodation.

Creativity

We were appointed directly by the School to produce proposals for works outside the Building Schools for the Future programme.

We designed two tuck shops to enliven the existing east and west tarmac playgrounds and to provide healthy food for pupils at break time.

The tuck shops were designed with a similar robust palette of materials employed elsewhere in the schools, including an engineering brick base and brightly coloured Trespa rain-screen panels.

Tuck shop

The simple, tapered boxes come alive during break times when the front hatches are opened to provide shelter and to serve students refreshments.